customer requirements:
*2 robots, 2 cooling extruding machines and a 4-axis hydraulic machine complete twice extrusion moulding of a rod; extruding workpiece: phosphatized rod;
*one robot loads material and another unloads material from the 1 nd hydraulic machine, then loads material to the 2 and last unloads.
application effect:
*for shaft parts, it uses rolling-magazine loading type (including positioning, separating structure) to ensure more than 2 hours automatic production;
*preset clearance between the part and hydraulic machine's grinding apparatus is 0.08mm, which effectively demonstrates the rb08 robot's repeated precision (the moulding does not increase auxiliary positioning device);
*compared to the original manual work, two rb08 robots cooperating shortens wait time of two operations, and one complete workpiece process period is 30s;
*that the higher flexible of rb08 makes it can be avoided the obstacle with the obstacle with the suitable posture even in the narrow space;
*humanized operation programming makes customers be ffamiliar with and know well operations, and shortens input use time.